It 3 am good to stop here. Im tired, Will work on the water cooling stuff tomorrow night.
Fan and radiator all together.
Have had a productive night. A few minor issues I had to over come. But hey here is a rgb test.
Gpu Tear down to install the water block
Pump Res and yes more rgb ang gpu are now installed. It has been a good day. tomorrow night i start measing and bending Rigid tubing.
once that is done ill tidy up all of the cables, leak test and put in the final fluid.
One of the best looking fan coolers i have seen in a while
Finally made some good progress on this build. tubes are bent and installed. dealt with multiple leaks, Part swaps and a few failed fittings. currently leak testing the build with sysprep and distilled water. Getting so close to finishing