Hello, this was my construction for the cmws but due to lack of time I did not get to finish it within the established deadlines, so I leave you some shots of the construction already completed.
This construction was a lot of fun due to the great amount of problems and improvisations to be able to finish it to a large extent those problems were due to the lack of materials due to the situation that exists in these days of isolation.
The materials used are 8 meters of 12mm diameter 1045 steel bars and stainless steel cutouts for the assembly of the components.
The reservoir consists of a swiftech d5 pump with custom top and cover and the reservoir is a tea infuser with new caps to fit.